Work-over is performed after the initial completion to re-establish commercial production or injection, repair of a mechanical problem in the well, or plug and abandon the well. Work-over operations are usually initiated as hydrocarbon production rates decline substantially. Undesired fluid production could be the result of a poor primary cement job or water/gas coning. These work-overs typically involve a remedial cement job to control the unwanted water/gas production. 

Well completion is performed at the completion of drilling operations to establish initial production from or injection into a well. Procedures of completion will vary depending on the completion type and the area. For Example flowing wells can simply be perforated and put on production. Low reservoir pressure areas often require an artificial lift mechanism (rod or submersible pump, gas lift valves, etc.) to produce at economic rates. 

This training course will highlight:

  • Types of Completions
  • Reasons for Work-overs and well preparation
  • Overview of Surface and Subsurface Well-bore Equipment and Procedures
  • Barriers, Completion and Work-over Fluids
  • Kick Causes, Warning Signs, kill methods and Risk awareness and Organizing a Well Control Operation

By the end of this training course, participants will be able to:

  • Plan, design, manage and execute completion operation
  • Improve the overall operational performance during work-over operations
  • Select or recommend completion equipment for given field conditions and applications
  • Select the most commonly used downhole tools and explain their function

DAY 1

TYPES OF COMPLETIONS

  • Wellhead configuration
  • Functional Requirements of a Completion
  • Completion Equipment
  • Flow Control Devices
  • Packers
  • Tubing
  • Circulation Devices
  • Expansion joints
  • Sub-Surface Safety Valves
  • Christmas Trees and it’s Types
  • Surface Equipment

DAY 2

REASONS FOR WORK-OVERS AND WELL PREPARATION

  • Formation damage
  • Sand control
  • Acidizing
  • Corrosion
  • Hydraulic fracturing
  • Mechanical problems
  • Well Preparations for work over
  • Tree and BOP Removal/Installation

DAY 3

OVERVIEW OF SURFACE AND SUBSURFACE WELL-BORE EQUIPMENT & PROCEDURES

  • Blowout Preventer Stacks and Components
  • Workstring and Production Tubing
  • Auxiliary Well Control Equipment
  • Plugs & Packers
  • Verification of Shut-in
  • Monitoring and Recording During Shut-in
  • Preparing for Well Entry
  • Wireline Open Hole Operations
  • Contingency Procedure for Wireline
  • Contingency Procedures for Coiled Tubing
  • Contingency Procedure for coiled tubing

DAY 4

BARRIERS, COMPLETION AND WORK-OVER FLUIDS 

  • philosophy and Operation of Barrier Systems
  • Levels of Barriers
  • Types of Barriers
  • Barrier Management
  • Influx Detection
  • Gas Characteristics and Behavior
  • Pressure and Volume Relationship (Boyles Law)
  • Workover/ Completion Fluid Functions
  • Liquids and Fluid Properties
  • Testing of Downhole Completion Equipment
  • Testing of Well Control Equipment Connections
  • Well Control Drills

DAY 5

KICK CAUSES, WARNING SIGNS, KILL METHODS, RISK AWARENESS & ORGANIZING A WELL CONTROL OPERATION, NATURAL FLOWING & ARTIFICIAL WELL WORK OVER PROGRAMS

  • Well Shut-in and Well Kill Considerations
  • Well Control Problems
  • Objective of Well Control Techniques
  • Bullheading
  • Volumetric Method
  • Lube and Bleed
  • Forward Circulation
  • (Driller’s) Method
  • Reverse Circulation
  • Handling Kill Problems
  • Potential Impacts of a Well Control Event
  • Well Integrity
  • Pressure Control Equipment/Barrier Envelope Considerations
  • Personnel Assignment
  • Plan Responses to Anticipated Well Control Scenarios
  • Blockages& Trapped Pressure in Tubing/Well-bore
  • Blockage & Restricted Access in Tubing/Well-bore
  • Hydrates
  • H2S considerations
  • Natural flowing and artificial well work over programs
  • Case studies

 

This training course is suitable to a wide range of professionals but will greatly benefit:

  • Production Technologists
  • Production Engineers
  • Operations Engineers
  • Field Technicians
  • Work-over Engineers

Course Schedules

  • 5 Days - Dec 19, 2027
  • english
  • face to face
  • Abha - KSA
  • $ 3,900
Register Now
  • 5 Days - Jun 7, 2027
  • english
  • face to face
  • Paris - France
  • $ 5,950
Register Now