TILOS (Time Location System) is planning software for managing linear construction projects, basic utilities, and infrastructure projects. It can be used in different construction industries, like Highway-, Railway-, Metro-, Fast Tram-, Pipeline- and Tunnel Construction, but also in Water Engineering or Transmission Line Building. Traditional planning systems display their results in bar charts or network diagrams. Linear projects present unique challenges because the crews and equipment move along the construction right-of-way to perform their work. Permits, environmental constraints, construction-related issues, and risk elements are easily incorporated into the plan to give a single overall view of the project. Neither of the traditional diagrams is able to show a graphical link between the location where the work is performed (the distance axis) and the time when it is executed (the time axis).
TILOS is used to incorporate design details, construction challenges, risk elements, and your project schedule in a single view. It is fully integrated with the leading CPM scheduling tools. It is simply the best tool for planning and managing linear projects.
This course target is for Project Portfolio Managers, Program Managers, Project Managers, Enterprise and Project Risk Managers, Project Control Managers, Project Control Engineers, Engineers and Planners, Information Technology Managers.