Seeking the optimum balance between cost, quality and time requirements is essential in managing a project. Cost engineering is the engineering practice devoted to the management of project cost, involving estimating, cost control, cost forecasting, investment appraisal and risk analysis. It is to have accurate cost estimates and schedules and to avoid cost overruns and schedule slips, act as supporting assessment in decision making. Earned Value Management is important to provide accurate forecasts of project performance problems which is an important

By the end of the program, participants will be able to:

  • Understand the business context, the project life cycle and the purpose of cost engineering
  • Learn the methodologies of project cost engineering to maximize business Return on Investment (ROI) in long run
  • Learn to prepare cost estimates & cost reduction strategies
  • Prepare cost estimates from high level factor estimating to very detailed equipment and bulk material cost, as well as managing cost effectively and maximizing profits.
  • Understand the principles and methodologies of risk analysis and execute risk mitigation
  • Learn the methodologies of risk management through risk analysis skill to better measure the parameters and uncertainties in a project.

Day 1

Cost Engineering Definitions & Cost Estimating Methodologies

  • Estimating Definitions
  • Factor Estimating
  • Case study: Factor estimating
  • Quantity Ratio Estimating
  • Case study: Quantity ratio estimating
  • Parametric and Range Estimating
  • Detailed Estimating
  • Case study: Detailed Estimating

Day 2

Location & Market Factor, Indices, Budgeting & Project

  • Location Factors and Market Factors
  • Case Study: Analyzing differences between locations and markets
  • Budgeting
  • Case Study: From Estimate to Budget
  • Project Control
  • Case Study: Earned Value Analysis
  • Advanced Project Control
  • Case Study: Advanced project control

Day 3

Assurance, Risk Identification, Assessment, Analysis & Management

  • Project Assurance
  • Case Study: Project Assurance
  • Risk Analysis Introduction & Definitions
  • Case Study: Setting up a risk analysis model
  • Risk Management
  • Case Study: Risk Management
  • Schedule Risk Analysis
  • Case Study: Schedule Risk Analysis
  • Integrated Cost and Schedule Risk Analysis
  • Case Study: Integrated cost/schedule risk analysis

Day 4

Definitions, Objectives, Methodologies and Analysis

  • Definitions and Principles
  • Case Study: Budget Allocation
  • Project Control
  • Case Study: Project Baseline and Control Sheet
  • Earned Value Analysis
  • Case Study: Earned Value Analysis

Day 5

Monitoring, Reporting & Advanced EVM

  • Monitoring
  • Case Study: Earned Value Monitoring
  • Reporting
  • Case Study: Project Controls Report and Dashboard
  • Advanced Earned Value Management
  • Case Study: Advanced Earned Value Management

This course is designed for cost engineering professionals who wish to enhance their knowledge in cost engineering and earned value management of projects, including:

  • Cost Engineers
  • Cost Estimators
  • Cost Controllers
  • Project Managers
  • Project Engineers
  • Project Planners
  • Finance Managers & Executives

Contribution for project  management.

Our Cost Engineering & Risk Management course is developed to help you learn the required techniques in project cost engineering and risk management to successfully manage project cost and risk.

Earned Value Management course is developed to help you learn the principles, methodologies in analysing project performance to contribute to project’s increased performance and success.

الجدول الزمني

  • 5 Days - Dec 20, 2027
  • english
  • face to face
  • Amsterdam - Netherlands
  • $ 5,950
سجل الان
  • 5 Days - Jul 25, 2027
  • english
  • face to face
  • Doha - Qatar
  • $ 4,500
سجل الان